Stepper Motor OEM Peristaltic Pump Special for Medical Dialysis Equipment


Price:
Sale price$358.61
Stock:
In stock

Description

SPECIFICATIONS

Brand Name: LanYuXuan

Origin: Mainland China

DIY Supplies: ELECTRICAL

Warranty: 1 Year

Customized support: OEM, ODM

Brand Name: Shenchen

Model Number: OEM-B236

Place of Origin: Hebei, China

Application: Food and Beverage Industry, Industrial Utilities

Power Source: Electric

Pressure: Low Pressure

Structure: OEM peristaltic pump

Voltage: 12v, 24v

Power: <80W

motor: Stepper Motor

Pump head: UC25

Flow rate: 0.3423~3331.5mL/min

Speed: 0.1-300rpm

Tube size: 13#, 14#, 16#, 25#

Tube material: Silicone tube

Pump head material: PSF & PC

Roller number: 2

Hello, welcome to my shop. What can I do for you? If you have any questions, you can send me product information to ask, if you have something urgent to tell me, please add my WhatsApp +86 17352823125 . If you need to confirm the product and confirm the shipping cost of the product, please contact me after placing the order. My email: 3353361535@qq.com
Product Description
OEM Peristaltic Pump Introduction
Compact pump head, functional design, more practical.
Transparent protective cover, can observe the working situation anytime;
Uncover signal output, stop working when uncover to ensure safety;
Running smoothly, low nosie;
Support DC motor, brushless DC motor, stepper motor, servo motor and AC motor.
Flow Data

Model
Housing Material
Tubing
Speed
(rpm)
Flow Rate
(mL/min)
Base
Protecting Cover
Size
IDxWall(mm)


UC25


PSF


PC
15#
4.8x2.4


0.1-300
0.3423-1027
24#
6.4x2.4
0.5033-1510
35#
7.9x2.4
0.8588-2576.5
36#
9.6x2.4
1.1105-3331.5
Technical Parameters
OEM-B236 Technical Specification
Model No.
OEM-B236
Motor type
57 stepper motor
Motor phase number
2
Motor step angle
1.8°
Motor phase voltage
1.5V
Motor phase current
3A
Working environment
0-40℃, 80%RH
Product Dimensions
Tubing Installation Procedure
STEP 1. Press the tubing clamp, put the tube into the U shaped groove.
STEP 2. Put the tubing between the two guide posts. Hold the spanner, rotate the wheel body.
STEP 3. Press the tubing clamp, put the tubing into the U shaped groove.
STEP 4. Installation is finished.
Related Products
Packing & Delivery
Packing: 1 set/carton.
Delivery Time: within 3 days after payment.
Courier: DHL, TNT, UPS, Fedex, delivery door to door.
Power Plug: GB, European standard, American standard, British standard.
Shenchen Workshop

You may also like

Recently viewed